Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0513
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Looking upstream at washout of backfill and subsidence of riprap at drop structure, Station 86+50. The washout occurred during initial priming of canal on May 28, 1961. Maximum flow during this priming was 33 C.F.S
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1961-06-01
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5422 X 4333 pixels, 1200 dpi.
Scanning Technician Ellen S. Kiever
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6g490ck
Setname ucl_rhc
ID 1379046
Reference URL https://collections.lib.utah.edu/ark:/87278/s6g490ck
Back to Search Results