Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0482
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Upstream view of drop structure located at Stanaker (Steinaker) Feeder Canal station 129+58. Bedding has been placed and 36 inch riprap is being placed downstream from the weir section of the drop structure. Work is being performed by L.C. Stevenson and Grant Hansen under specifications DC-5317.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1961-03-17
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5530 x 4258 pixels, 1200 dpi,
Scanning Technician Elaine Carr
Scanning Device Epson Perfection 4870 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s63c085s
Setname ucl_rhc
ID 1379016
Reference URL https://collections.lib.utah.edu/ark:/87278/s63c085s
Back to Search Results