Operator C. J. Miller, Station Building, Murdock Plant on the Provo River, November 5, 1951

Request Archival File or Update Item Information
Title Operator C. J. Miller, Station Building, Murdock Plant on the Provo River, November 5, 1951
Photo Number P0206add2n10_21_003
Description Scan of photograph of Operator C. J. Miller, Station Building, Murdock Plant on the Provo River, November 5, 1951
Date 1951-11-05
Textual Date November 5, 1951
Keywords Utah Power and Light Company; Rocky Mountain Power; Knight Consolidated Power Company; Jordanelle; Public utilities; Electric Utilities; Complexes; Industrial complexes; Power plants; Hydroelectric power plants; Provo River (Utah); Men; Workers; Skilled workers; Technicians
Subject Hydroelectric power plants--Utah--Wasatch County--Photographs
Spatial Coverage Wasatch County (Utah); Provo River (Utah)
Latitude 40.6061
Longitude -111.4077
Additional Information The Murdock hydroelectric plant, installed in 1910, was located along the Provo River in the valley now filled by Jordanelle Reservoir, Wasatch County, Utah.
Collection Number and Name P0206 Rocky Mountain Power Company Photograph Collection
Collection Name Rocky Mountain Power Company
Rights
Type Image
Finding Aid https://archiveswest.orbiscascade.org/ark:80444/xv479461
Digitization Specifications Digital image produced on Epson Expression 10000 XL scanner, 24-bit color at 600 ppi. Archival file is uncompressed TIF.
ARK ark:/87278/s6gj1h73
Setname uum_map
ID 1000718
Reference URL https://collections.lib.utah.edu/ark:/87278/s6gj1h73
Back to Search Results