| Title | Relicensing writing guidelines, Lake Chelan Hydroelectric Project, FERC NO. 637 |
| Description | Writing guidelines for renewal of Chelan hydroelectric project and report on lamprey eels in the Columbia River |
| Subject | Lake Chelan Hydroelectric Project; Rocky Reach Hydroelectric Project; Water-power--Washington (State); Hydroelectric power plants--Washington (State); Lampreys--Columbia River |
| Contributor | Chelan County Public Utility District; United States. Federal Energy Regulatory Commission; BioAnalysts, Inc. |
| Alternate Title | Relicensing writing guidelines, Lake Chelan Hydroelectric Project, FERC NO. 637 |
| Additional Information | Includes: Relicensing writing guidelines, Lake Chelan Hydroelectric Project, FERC NO. 637 (19 pages, November 1997); A Status of Pacific Lamprey in the Mid-Columbia region: Rocky Reach Hydroelectric Project, FERC Project no.2145, Prepared by BioAnalysts, Inc. for Public Utility District No. 1 of Chelan County (34 pages, Dec. 15, 2000) |
| Spatial Coverage | Chelan, Lake (Wash.); Rocky Reach Reservoir (Wash.); Columbia River |
| Collection Number and Name | Accn1251 bx390 fd4; E. Richard Hart papers |
| Rights Management | Digital Image © 2010 University of Utah. All Rights Reserved. |
| Holding Institution | J. Willard Marriott Library, University of Utah |
| Date | 1997-11; 2000-12-15 |
| Digitization Specifications | Original scanned on Epson Expression 10000 XL and saved as 400 ppi TIFF. Display image generated in Contentdm. |
| Publisher | Digitized by J. Willard Marriott Library, University of Utah |
| Type | Text |
| ARK | ark:/87278/s6z0373k |
| Setname | wwdl_neh |
| ID | 1151496 |
| Reference URL | https://collections.lib.utah.edu/ark:/87278/s6z0373k |