| Title | Flaming Gorge Dam Suspension Bridge Construction |
| Identifier | 761-04.tif |
| Subject | Construction--Bridges--Suspension Bridge |
| Spatial Coverage | Flaming Gorge (Utah) |
| Description | These steel cables supported the supension bridge that will be an important link between Vernal, Dutch John, and Flaming Gorge construction area. The bridge is scheduled for completion in May 1960, with an access road that will enable Dutch John residents to visit Vernal with the minimum of difficulty. |
| Source Collection | Vernal Express Collection |
| Source Material | B&W Copy Negative and Print |
| Publisher Digital | Uintah County Library Regional History Center |
| Date | 2005-03-05 |
| Type | Image |
| Format | image/jpeg |
| Language | eng |
| Rights | Digital image, copyright 2005 Uintah County Library |
| Source Physical Dimensions | 6cm X 6cm |
| Archival Resolution | 4800 X 3400 pixels; 2500 ppi |
| Low Resolution | 800 X 600 pixels |
| Bit Depth | 8 |
| Scanning Device | Creo-Scitex Jazz + flatbed scanner |
| Scanning Technician | Aric Hansen |
| ARK | ark:/87278/s6zw53qq |
| Setname | ucl_vep |
| ID | 1090449 |
| Reference URL | https://collections.lib.utah.edu/ark:/87278/s6zw53qq |