Flaming Gorge Dam Suspension Bridge Construction

Title Flaming Gorge Dam Suspension Bridge Construction
Identifier 761-04.tif
Subject Construction--Bridges--Suspension Bridge
Spatial Coverage Flaming Gorge (Utah)
Description These steel cables supported the supension bridge that will be an important link between Vernal, Dutch John, and Flaming Gorge construction area. The bridge is scheduled for completion in May 1960, with an access road that will enable Dutch John residents to visit Vernal with the minimum of difficulty.
Source Collection Vernal Express Collection
Source Material B&W Copy Negative and Print
Publisher Digital Uintah County Library Regional History Center
Date 2005-03-05
Type Image
Format image/jpeg
Language eng
Rights Digital image, copyright 2005 Uintah County Library
Source Physical Dimensions 6cm X 6cm
Archival Resolution 4800 X 3400 pixels; 2500 ppi
Low Resolution 800 X 600 pixels
Bit Depth 8
Scanning Device Creo-Scitex Jazz + flatbed scanner
Scanning Technician Aric Hansen
ARK ark:/87278/s6zw53qq
Setname ucl_vep
ID 1090449
Reference URL https://collections.lib.utah.edu/ark:/87278/s6zw53qq