Additional Information |
Vernal City Office Blue Prints, 445 East Main, Vernal, Utah (Sheet 2) -- Sheet 2 Proposed Plot Plan -- Utah -- Vernal -- Main Street -- If old casing is used it will be sand blasted to remove all rust, then primed before installation. Paint after installation, all welds will be ground smooth. -- 2# rebar, grade as continuous -- Vernal City Police Department -- Existing curb, gutter, and sidewalk -- Public and employ parking -- Existing Building -- Asphalt -- Landscaped Island -- Notes: All exterior concrete to be 6 1/2 bag, Vernal City mix, At no time will the slump exceed 4" + 1/2", 3400# breaks hard in 28 days. As per A.S.T.M. When demolition of building starts leave 4+ of block along East wall for wall between city and Perry Motor. This will be sealed and painted when new concrete work and paving is completed. Color to be chosen by owner. Visitor will be painted in front of each parking stall in front of building. Curbs facing pavement around island and planters to be painted red and marked no parking. Landscaping to be negotiated between landscape contractor and owner. Parking and travel lands will be sloped to island and out to curb along Main Street. |