Title |
Steinaker Dam Construction |
Identifier |
P325-418-1483 |
Subject |
Steinaker Dam--Central Utah Water Project; Construction; Vernal, Utah |
Description |
Block 1 - Looking north from station 44+50, at sloughing area on the upstream end of the shield at station 45+00. Trench in front of the shield sloughed 4' to 6' wide from top to bottom of excavation. Topsoil material appeared to be unstable possibly due to Mr. Oaks irrigating in field very recently. |
Publisher |
Uintah County Regional History Center |
Contributors |
By permission of the Bureau of Reclamation of the United States Government |
Date |
1970-09-09 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2019 Uintah County Regional History Center |
Holding Institution |
Uintah County Regional History Center |
Bit Depth |
8 |
Archival Resolution |
2621 x 2473 pixels, 1200 dpi, |
Scanning Technician |
Linda S. Wilson |
Scanning Device |
Epson Perfection V800 Photo Scanner |
Spatial Coverage |
Vernal (Utah) |
Source Material |
Bureau of Reclamation |
ARK |
ark:/87278/s6w710jj |
Setname |
ucl_rhc |
ID |
1407635 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6w710jj |