Title |
Steinaker Dam Construction |
Identifier |
P325-418-1474 |
Subject |
Steinaker Dam--Central Utah Water Project; Construction; Vernal, Utah |
Description |
Looking at the right front side of the safety shield. The front hopper is used for bottom filtering materials and the rear hopper for the top filter cover. The shield is moved along the trench by the two cables in front pulled by the backhoe. Note: The narrow shoe along the base of the shield. This is too narrow to support this heavy (4 ton) shield in soft materials. |
Publisher |
Uintah County Regional History Center |
Contributors |
By permission of the Bureau of Reclamation of the United States Government |
Date |
1970-08-24 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2019 Uintah County Regional History Center |
Holding Institution |
Uintah County Regional History Center |
Bit Depth |
8 |
Archival Resolution |
2455 x 2473 pixels, 1200 dpi, |
Scanning Technician |
Linda S. Wilson |
Scanning Device |
Epson Perfection V800 Photo Scanner |
Spatial Coverage |
Vernal (Utah) |
Source Material |
Bureau of Reclamation |
ARK |
ark:/87278/s61z8j6t |
Setname |
ucl_rhc |
ID |
1407626 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s61z8j6t |