Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-1474
Subject Steinaker Dam--Central Utah Water Project; Construction; Vernal, Utah
Description Looking at the right front side of the safety shield. The front hopper is used for bottom filtering materials and the rear hopper for the top filter cover. The shield is moved along the trench by the two cables in front pulled by the backhoe. Note: The narrow shoe along the base of the shield. This is too narrow to support this heavy (4 ton) shield in soft materials.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1970-08-24
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2019 Uintah County Regional History Center
Holding Institution Uintah County Regional History Center
Bit Depth 8
Archival Resolution 2455 x 2473 pixels, 1200 dpi,
Scanning Technician Linda S. Wilson
Scanning Device Epson Perfection V800 Photo Scanner
Spatial Coverage Vernal (Utah)
Source Material Bureau of Reclamation
ARK ark:/87278/s61z8j6t
Setname ucl_rhc
ID 1407626
Reference URL https://collections.lib.utah.edu/ark:/87278/s61z8j6t
Back to Search Results