Title |
Battle Creek power plant, Utah County, Utah [17] |
Photo Number |
P0206add2n01_16_015 |
Description |
Scan of a letter dated 22 March 1951 from Arthur Jobson to Mr. Hale, conveying the two 1906 pictures. He was an employee during the construction of Battle Creek plant |
Date |
1951-03-22 |
Textual Date |
March 22, 1951 |
Keywords |
Rocky Mountain Power; Utah Power and Light; Telluride Power Comapny; Battle Creek; Power plants |
Subject |
Hydroelectric power plants--Utah--Utah County--Photographs |
Spatial Coverage |
Kiwanis Park (Pleasant Grove, Utah); Pleasant Grove (Utah); Utah County (Utah) |
Latitude |
40.364167 |
Longitude |
-111.701111 |
Additional Information |
The Battle Creek power plant was built around 1906 by the Telluride Power Company (which later became part of Utah Power and Light). Water diverted from the north fork of Battle Creek ran through a pipeline to a reservoir, and from there it dropped through a steep penstock to the power plant near the mouth of Battle Creek. The neoclassical building that housed the generators is gone, but its site is now in Pleasant Grove's Kiwanis Park. |
Collection Number and Name |
P0206 Rocky Mountain Power Company Photograph Collection |
Collection Name |
Rocky Mountain Power Company |
Rights |
|
Type |
Image |
Finding Aid |
https://archiveswest.orbiscascade.org/ark:80444/xv479461 |
Digitization Specifications |
Digital image produced on Epson Perfection V700 Photo scanner, RGB, at 2000dpi. Archival file is uncompressed TIFF. |
ARK |
ark:/87278/s6xw59h6 |
Setname |
uum_map |
ID |
985705 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6xw59h6 |