Abstract |
During the past ten years, the Dow Chemical Co. has been involved with the design, installation, and operation of four large multipoint ground flares. The first one has been in service for over eight years, and the other three have come into service within the past two years. As one might expect with equipment this large and complicated, the facilities have seen various issues / problems. This paper will be given to allow suppliers and other users in industry to learn from these experiences and to avoid the same problems with future designs / installation and construction / operations.; ; The following general subjects will be covered:; •; Thermal expansion; •; Staging valve bypass valves; •; Flooring materials; •; Shields / protection / bolting; •; First stage operation; •; Pilot operations / ignition; •; Retractable thermocouple system; •; Small bore piping; ; The presentation time allotment can provide opportunities for audience discussion as well. |