Green River Bridge Construction

Update Item Information
Title Green River Bridge Construction
Identifier VE2360
Subject Green River; Bridge; Men; Equipment
Spatial Coverage Vernal (Utah)
Description Construction is well underway of the Green River bridge that leads from Split Mountain to Blue Mountain. The bridge is located by the Doug Chew ranch and is part of the road from Dinosaur Nation Monument Quarry. The roadway on the bridge is 26 feet wide and is 400 feet long.
Donor Vernal Express
Source Collection Vernal Express
Publisher Digital Uintah County Regional History Center
Date 1962-07-26
Type Image/StillImage
Format image/jpeg
Language eng
Rights Digital Image, Copyright 2020 Uintah County Regional History Center
Archival Resolution 700 dpi, 5299 x 3538 pixels
Low Resolution 800 x 600 pixels
Bit Depth 8
Scanning Device Epson Perfection V800
Scanning Technician Elaine Carr
ARK ark:/87278/s63v56z0
Setname ucl_vep
ID 1602181
Reference URL https://collections.lib.utah.edu/ark:/87278/s63v56z0
Back to Search Results