Flaming Gorge Suspension Bridge Construction

Update Item Information
Title Flaming Gorge Suspension Bridge Construction
Identifier 761-09.tif
Subject Construction--Bridges--Suspension Bridge
Spatial Coverage Flaming Gorge (Utah)
Description Almost Done! Crews working fast to complete the bridge by the end of May. This view is from the east side of the bridge. The decking and sides are in place and some clean-up work is needed. It shows the entire length of the 421 foot cable suspension bridge completed at a cost of $118,653. The bridge was removed when the Flaming Gorge Dam and Cart Creek Bridge was complete.
Source Collection Vernal Express Collection
Source Material B&W Copy Negative and Print
Publisher Digital Uintah County Library Regional History Center
Date 2005-03-05
Type Image
Format image/jpeg
Language eng
Rights Digital image, copyright 2005 Uintah County Library
Source Physical Dimensions 6cm X 6cm
Archival Resolution 4800 X 3400 pixels; 2500 ppi
Low Resolution 800 X 600 pixels
Bit Depth 8
Scanning Device Creo-Scitex Jazz + flatbed scanner
Scanning Technician Aric Hansen
ARK ark:/87278/s6b602h7
Setname ucl_vep
ID 1090454
Reference URL https://collections.lib.utah.edu/ark:/87278/s6b602h7
Back to Search Results