Steinaker Dam Spillway Construction

Update Item Information
Title Steinaker Dam Spillway Construction
Identifier 0327D
Subject Steinaker Dam--Construction
Description Steinaker Dam's stilling basin and spill way is under construction. The stilling basin reduces the high velocity water as it comes out of the reservoir though the tunnel and in the canal. The switchback on top is an emergency spillway in case of over flow.
Publisher Uintah County Regional History Center
Date 1960
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2022 Uintah County Regional History Center
Holding Institution Uintah County Regional History Center
Archival Resolution 1000 dpi, 4382 x 3426 pixels
Low Resolution 800 x 600 pixels
Bit Depth 8
Scanning Device Epson Perfection V800
Scanning Technician Elaine Carr
Spatial Coverage Vernal (Utah)
Donor Rhoda Deved
Website uintahhistory.org
ARK ark:/87278/s66mzkm3
Setname ucl_tp
ID 2073391
Reference URL https://collections.lib.utah.edu/ark:/87278/s66mzkm3
Back to Search Results