Title |
Steinaker Dam Construction |
Identifier |
P325-418-1480 |
Subject |
Steinaker Dam--Central Utah Water Project; Construction; Vernal, Utah |
Description |
Block 1 - Looking northwest at north part of cavity that developed during construction near station 14+80. Workers can be seen compacting the ground over the pipeline being laid. The cavity was 41 feet long from the north to south and 38.5 feet wide from east to west with depth of the hole is approximately 9.0 feet |
Publisher |
Uintah County Regional History Center |
Contributors |
By permission of the Bureau of Reclamation of the United States Government |
Date |
1970-09-20 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2019 Uintah County Regional History Center |
Holding Institution |
Uintah County Regional History Center |
Bit Depth |
8 |
Archival Resolution |
2621 x 2473 pixels, 1200 dpi, |
Scanning Technician |
Linda S. Wilson |
Scanning Device |
Epson Perfection V800 Photo Scanner |
Spatial Coverage |
Vernal (Utah) |
Source Material |
Bureau of Reclamation |
ARK |
ark:/87278/s68h30gk |
Setname |
ucl_rhc |
ID |
1407632 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s68h30gk |