Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0749
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description View showing dragline at approximate Station 453+00 excavating left slope back to specified 2:1 slope. Initially, the slope was built to a steeper slope which was not acceptable. Work being done by A&B Construction Company under Specifications No. DC-5464
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-07-11
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 4368 X 5584 pixels, 1200 dpi
Personal Names Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6ps2548
Setname ucl_rhc
ID 1379555
Reference URL https://collections.lib.utah.edu/ark:/87278/s6ps2548
Back to Search Results