Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0748
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Looking downstream from Station 451+00 at dragline excavition left slop to specified 2:1 slope. Reach initially built to about a 1:1 Slope which was not acceptable. The right slope also had to be cut back as shown. Work being done by A & B Construction Company under Specifications No. DC-5464.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-07-11
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 4367 X 5584 pixels, 1200 dpi
Personal Names Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6tf46jm
Setname ucl_rhc
ID 1379554
Reference URL https://collections.lib.utah.edu/ark:/87278/s6tf46jm
Back to Search Results