Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0727
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Downstream portion of drop at Station 101+40 after repair on June 5, 1962. Riprap downstream of the large rocks on the longitudinal slope had been removed by canal flows. Tock used in teh replacement wer smaller than 1/4 cubic yard. House located on 1500 West near 750 North in Vernal.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-06-05
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5566 X 4331 pixels, 1200 dpi
Scanning Device Ellen S. Kiever
Personal Names Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6j432q7
Setname ucl_rhc
ID 1379533
Reference URL https://collections.lib.utah.edu/ark:/87278/s6j432q7
Back to Search Results