Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0715
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description View looking upstream showing water from farmer's own head ditch flowing into the canal. the turnout is located at Station 563+80 and is flowing about 4 g.p.m. Work is being done by A & B Construction Company under Specifications No. DC-5464.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-05-21
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5566 X 4331 pixels, 1200 dpi
Scanning Technician Ellen S. Kiever
Scanning Device Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s64v0th1
Setname ucl_rhc
ID 1379520
Reference URL https://collections.lib.utah.edu/ark:/87278/s64v0th1
Back to Search Results