Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0675
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Looking downstream at canal and drops from station 77+50. Water is ponded at a depth of 3.2 feet above the drop crest as part of the priming operation. THe work is being done under specifications 400C-192 by Hansen Construciton Company.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-04-14
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Bit Depth 8
Archival Resolution 5439 x 4313 pixels, 1200 dpi,
Scanning Technician Elaine Carr
Scanning Device Epson Perfection 4870 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s69k8mck
Setname ucl_rhc
ID 1379480
Reference URL https://collections.lib.utah.edu/ark:/87278/s69k8mck
Back to Search Results