Flaming Gorge Dam Construction

Update Item Information
Title Flaming Gorge Dam Construction
Identifier 0108BOR
Subject Flaming Gorge Dam--Construction
Description Harold Sitz, placement foreman for the dam, pulls the rope to release 8-cubic yards of concrete into a section of the dam in October 1960. The bucket is shown suspended from the cableway discharging the concrete into the forms.
Publisher Uintah County Library Regional History Center
Date 1960-10
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2025 Uintah County Regional History Center
Holding Institution Uintah County Library Regional History Center
Bit Depth 8
Archival Resolution 800 dpi, 5936 x 7506 pixels
Low Resolution 800 x 600 pixels
Scanning Technician Elaine Carr
Scanning Device Epson Perfection V800
Spatial Coverage Elaine Carr
Donor Bureau of Reclamation
Website history.uintahlibrary.org/history
ARK ark:/87278/s654shvx
Setname ucl_rhc
ID 2628401
Reference URL https://collections.lib.utah.edu/ark:/87278/s654shvx
Back to Search Results