Title |
Flaming Gorge Spillway Tunnel |
Identifier |
0093BOR |
Subject |
Tunnel--Flaming Gorge |
Description |
The spillway tunnel at Flaming Gorge is bored through solid rock. The view is looking into the tunnel from the downstream portal of the dam. The jumbo drill rig is at the head of the tunnel and is preparing to drill another round. The tunnel is bored to a 21-foot diameter at downstream and 3--foot diameter at upstream. It has been excavated 200 feet with 500 feet to go. When complete it will be lined with concrete. |
Publisher |
Uintah County Library Regional History Center |
Date |
1960-10 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2025 Uintah County Regional History Center |
Holding Institution |
Uintah County Library Regional History Center |
Bit Depth |
8 |
Archival Resolution |
1200 dpi, 4994 x 6902 pixels |
Low Resolution |
800 x 600 pixels |
Scanning Technician |
Elaine Carr |
Scanning Device |
Epson Perfection V800 |
Spatial Coverage |
Elaine Carr |
Donor |
Bureau of Reclamation |
Website |
history.uintahlibrary.org/history |
ARK |
ark:/87278/s6ygdfs9 |
Setname |
ucl_rhc |
ID |
2628386 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6ygdfs9 |