Title |
Pipeline Construction |
Identifier |
ucl_1829-1 |
Subject |
Construction--pipeline; Equipment |
Spatial Coverage |
Vernal (Utah) |
Description |
Before Backhoes, there were tractors with a backhoe attachment. An operator is digging a trench to lay pipe. Another man is down in the trench watching as the operation continues. |
Date |
1950; 1951; 1952; 1953; 1954; 1955; 1956; 1957; 1958; 1959; 1960 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights |
Digital Image, Copyright 2017 Uintah County Regional History Center |
Archival Resolution |
4800 x 3400 pixels; 2500 ppi |
Low Resolution |
800 x 600 pixels |
Bit Depth |
8 |
Scanning Device |
Creo Scites Jazz + flatbed scanner |
Scanning Technician |
Aric Hansen |
ARK |
ark:/87278/s6866b1x |
Setname |
ucl_vep |
ID |
1277267 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s6866b1x |