Mid-canyon reservoir and the Upper Mill Creek Plant

Request Archival File or Update Item Information
Title Mid-canyon reservoir and the Upper Mill Creek Plant
Photo Number P0206add2n33_024
Description Scan of photo of mid-canyon reservoir and the Upper Mill Creek Plant.
Date 1912-05
Textual Date May 1912
Keywords Rocky Mountain Power; Utah Power and Light; Power Company; Knight Consolidated Power Company; Mill Creek
Subject Hydroelectric power plants--Utah--Salt Lake County--Photographs
Spatial Coverage East Mill Creek (Utah); Salt Lake County (Utah); Mill Creek (Salt Lake County, Utah)
Latitude 40.688819
Longitude -111.786872
Additional Information The Lower Mill Creek hydroelectric plant was built in 1910 near the mouth of Mill Creek Canyon, with its headworks five miles up, just below the Upper plant. Built by Knight Consolidated Power Company, which became part of Utah Power & Light in 1912. From a book of photos with title: Electric plants and systems near Salt Lake City-not including Telluride Power Co., which was compiled by J. E. Moore in May 1912 for L. L. Nunn (head of Telluride Power)
Collection Number and Name P0206 Rocky Mountain Power Company Photograph Collection
Collection Name Rocky Mountain Power Company
Rights
Type Image
Finding Aid https://archiveswest.orbiscascade.org/ark:80444/xv479461
Digitization Specifications Digital image produced on Epson Expression 10000 XL scanner, RGB, at 400 ppi. Archival file is uncompressed TIF.
ARK ark:/87278/s6ff72z2
Setname uum_map
ID 994420
Reference URL https://collections.lib.utah.edu/ark:/87278/s6ff72z2
Back to Search Results