Title |
Steinaker Dam Construction |
Identifier |
P325-418-1162 |
Subject |
Dam--Steinaker Dam-Construction; Canals-Feeder Canals-Steinaker Feeder Canal; Central Utah Water Project |
Description |
Dry Fork Creek at the U.S.G.S. gage Dry Fork at the mouth Water had been flowing over the bridge deck when brush and trees dislodged by the high flows partially plugged the upstream bridge opening. Uintah County Road Department crews were on hand to prevent damage to the bridge. A U.S.G.S cable car spanning the stream at this point was washed out. Flow was estimated to be 700 c.f.s. at the time the picture was taken by had been 0.80 feet higher. This looks to be the bridge that was on the Merkley Park road. |
Publisher |
Uintah County Regional History Center |
Contributors |
By permission of the Bureau of Reclamation of the United States Government |
Date |
1961-10-30 |
Type |
Image/StillImage |
Format |
image/jpeg |
Language |
eng |
Rights Management |
Digital Image, Copyright 2018 Uintah County Regional History Center |
Holding Institution |
Uintah County Regional History Center |
Bit Depth |
8 |
Archival Resolution |
5530 x 4368 pixels, 1200 dpi. |
Scanning Technician |
Ellen S. Kiever |
Scanning Device |
Epson Perfection 4990 Photo Scanner |
Spatial Coverage |
Vernal (Utah) |
ARK |
ark:/87278/s61g4xc8 |
Setname |
ucl_rhc |
ID |
1391099 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s61g4xc8 |