Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0396
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Pre-cast concrete cut-off walls used as an alternate construction method to concrete sheet piles. These partial walls are hoisted into position after which the upper parts of the walls are constructed. Work by L. C. Stevensen and Grant Hansen, contractors under specifications DC-5317.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5530 x 4313 pixels, 1200 dpi,
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6h179rr
Setname ucl_rhc
ID 1378314
Reference URL https://collections.lib.utah.edu/ark:/87278/s6h179rr
Back to Search Results