Jensen Bridge

Update Item Information
Title Jensen Bridge
Identifier 2100.tif
Creator Hannah Harrison Rodeback
Subject Green River Bridge -- Bridges
Description Green River Bridge, side view in the winter. In the fall of 1909 the steel was hauled from Dragon to Jensen by team and wagons, through mud almost to the axle of their wagons. About the middle of January 1910, the contractors commenced work and started to dig the hole for the west pier and immediately put the logs down in the sand, then laid the steel on to it and bolted it together. This was completed before the high water came in the spring. The bridge was built all but the small span on the east side because engineer made a small mistake in measuring the distance. It was completed by July 24, 1911 for the Bridge Day celebration.
Publisher Uintah County Library Regional History Center
Date 1911-07-24
Type Image
Format image/jpeg
Language eng
Rights Management Digital image, copyright 2003 Uintah County Library
Source Physical Dimensions 6cm x 6cm
Bit Depth 8
Scanning Technician Aric Hansen
Scanning Device Creo-Scitex Jazz + flatbed scanner
Spatial Coverage Uinta Basin (Utah and Colo.)
Donor Hannah Harrison Rodeback
Source Material B&W copy negative and print
ARK ark:/87278/s6dr680d
Setname ucl_rhc
ID 393472
Reference URL https://collections.lib.utah.edu/ark:/87278/s6dr680d
Back to Search Results