Spatial Coverage |
Uintah County (Utah) |
Date |
1995 |
Title |
Ouray Wildlife Refuge Scheme 6 - 1995 - Control of Flood Inflow to the Nursery Habitat |
Subject |
Uintah County; Utah; Ouray Wildlife Refuge Exhibit 6; Green River; Existing Culverts; Scheme 6; Control of Flood Inflow to the Nursery Habitat; Flo Engineering Inc; Exhibit 6; Control of Flood Inflow to Nursery Habitat; Ouray Wildlife Refuge; Components of Scheme 6 |
Publisher |
Uintah County Regional History Center |
Type |
Image/StillImage |
Format |
image/jpeg |
Identifier |
0808M |
Language |
eng |
Rights Management |
Digital Image Copyright 2023 Uintah County Regional History Center |
Website |
uintahhistory.org |
Owning Institution |
Uintah County Regional History Center |
Additional Information |
Ouray National Wildlife Refuge Exhibit 6 Semi-control of flood Inflow to Nursery Habitat -- Ouray Wildlife Refuge Ex. 6-Control of Flood Inflow to Nursery Habitat -- Designed by: JOB -- Date: 08/24/1994 -- Revised Schemes 1-7 05/01/1995 -- Proposed Schemes 1-4 10/24/1994 -- Flo Engineering Inc. |
ARK |
ark:/87278/s61ppjzk |
Setname |
ucl_maps |
ID |
2364639 |
Reference URL |
https://collections.lib.utah.edu/ark:/87278/s61ppjzk |