Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0996
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Steinaker Feeder Canal -Vernal Unit-Central Utah Project, Utah--Looking downstream at 350 c.f.s. flow on drop at Station 101+40 on the Steinaker Feeder Canal. Note that there is no freeboard left on the drop.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1964-05-22
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Uintah County Regional History Center
Bit Depth 8
Archival Resolution 5566 X 4331 pixels, 1200 dpi.
Scanning Technician Linda S. Wilson
Scanning Device Epson Perfection 4870 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s62c380c
Setname ucl_rhc
ID 1387976
Reference URL https://collections.lib.utah.edu/ark:/87278/s62c380c
Back to Search Results