Flaming Gorge Dam Construction

Update Item Information
Title Flaming Gorge Dam Construction
Identifier 0084BOR
Subject Flaming Gorge Dam--Construction
Description View looking downstream into the foundation of the Flaming Gorge Dam and powerplant. Placements of mass concrete have been made in high blocks 10, 12, 14, and 16 in the dam. Concrete has been placed in the substructure of the powerplant located at the downsteam toe of the dam. At left center is the concrete blocks for the outlet works and the tailrace training wall.
Publisher Uintah County Library Regional History Center
Date 1960-10-13
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2025 Uintah County Library Regional History Center
Holding Institution Uintah County Library Regional History Center
Bit Depth 8
Archival Resolution 800 dpi, 7506 x 5873 pixels
Low Resolution 800 x 600 pixels
Scanning Technician Elaine Carr
Scanning Device Epson Perfection V800
Spatial Coverage Flaming Gorge Recreation Area
Donor Bureau of Reclamation
Website history.uintahlibrary.org/history
ARK ark:/87278/s63mxpm4
Setname ucl_rhc
ID 2594328
Reference URL https://collections.lib.utah.edu/ark:/87278/s63mxpm4
Back to Search Results