Steinaker Dam Construction

Update Item Information
Title Steinaker Dam Construction
Identifier P325-418-0731
Subject Dam--Steinaker Dam--Construction; Central Utah Water Project
Description Downstream view of canal reach between Stations 177+00 and 186+00. This reach was originally specified to have been earth lined, but high ground water elevations on both slopes prevented lining all but the canal botton. Work being done by A & B Construction Company under Specifications No. DC-5464.
Publisher Uintah County Regional History Center
Contributors By permission of the Bureau of Reclamation of the United States Government
Date 1962-06-19
Type Image/StillImage
Format image/jpeg
Language eng
Rights Management Digital Image, Copyright 2018 Uintah County Regional History Center
Holding Institution Bureau of Reclamation
Bit Depth 8
Archival Resolution 5584 X 4367 pixels, 1200 dpi
Personal Names Epson Perfection 4990 Photo Scanner
Spatial Coverage Vernal (Utah)
ARK ark:/87278/s6158s6s
Setname ucl_rhc
ID 1379537
Reference URL https://collections.lib.utah.edu/ark:/87278/s6158s6s
Back to Search Results