Dowd Mountain Road

Update Item Information
Title Dowd Mountain Road
Identifier VE2828
Subject Roads; Dowd Mountain; Road Construction
Spatial Coverage Vernal (Utah)
Description The Dowd Mountain cutoff road is under construction at Spring Canyon. The contractor has constructed a preliminary road so that rock work on the dugway may be continued through winter months. The top arrow show the old Switch-back road. the lower arrows point tot he new preliminary road which is now being widened and improved with cuts and fills.
Donor Vernal Express
Source Collection Vernal Express
Publisher Digital Uintah County Regional History Center
Date 1968-09-19
Type Image/StillImage
Format image/jpeg
Language eng
Rights Digital Image, Copyright 2021 Uintah County Regional History Center
Archival Resolution 600 dpi, 4542 x 3021 pixels
Low Resolution 800 x 600 pixels
Bit Depth 8
Scanning Device Epson Perfection V800
Scanning Technician Elaine Carr
ARK ark:/87278/s6xm46gc
Setname ucl_vep
ID 1636701
Reference URL https://collections.lib.utah.edu/ark:/87278/s6xm46gc
Back to Search Results