Show ing ramp at Lemon Reservoir, Colo., is anticipated by the end of the year. Camping facilities, roads and parking areas at Paonia Reservoir have been completed. At the Pine River site in the Navajo Reservoir Recreation Area, the water supply and distribution system, the sanitary system and four comfort stations have been completed. In the Colorado portion of the area, water system, sanitary system, access roads, and a boat launching ramp have been completed at the Arboles sites. 3. ALLOCATON OF FEDERAL INVESTMENT Section 6 of the authorizing act states that upon completion of each unit, participating project, or separable feature thereof, the Secretary shall allocate the total cost of constructing said unit, project, or feature to the various purposes authorized in the act or authorized under reclamation law. No formal allocations to the several purposes to be served by the project have been made of the cost to June 30, 1964. However, tentative allocations have been made of the total estimated cost of projects now under construction (see schedule No. 6). The tentative allocations are summarized as follows: Purpose Amount Percent (thousands) Reimbursable allocations: Irrigation ...................................'............................................................................. $220,316 21.5 Power ..................................................................................................................... 561,102 54.6 Municipal and industrial water ..................................................................... 35,261 3.4 Total .................................................................................................................. 816,679 79.5 Nonreimbursable allocations: Flood Control ........................................................................................................ 1,609 .2 Fish and wildlife ................................................................................................ 36,968 3.6 Recreation ............................................................................................................ 29,921 2.9 Irrigation (Navajo Indian irrigation project)1 ............................................ 135,070 13.1 Other nonreimbursable costs: Colorado River fund investigations, non-Federal contributions, and cost of road relocations under Public Law 87-874 ........................................................................................................ 6,696 .7 Total .............................................................................................................. 210,264 20.5 Total .............................................................................................................. 1,026,943 100.0 Classified as nonreimbursable pending determination of repayment capability per sec. 6 of the act of Apr. 11, 1956. Note.-The above allocation includes only those projects now under construction. 126 |